top of page
i -Beam Structural Platform

i -Beam Structural Platform

Steel Structural Platform Mezzanine Floor is an intermediate floor between main floors of a building, and therefore typically not counted among the overall floors of a building.

钢结构平台夹层地板是建筑物主要楼层之间的中间楼层,因此通常不计入建筑物的整体楼层

 

The majority of mezzanine floors, which Gold Wind supply and install, are free-standing structures and not fixed to the fabric of the building. 

金风工程供应和安装的大部分夹层楼层都是独立结构,并不固定在建筑物的结构上。

 

Mezzanine Floor can be designed for a wide range of applications and usages including storage, offices, and production. The loading of a mezzanine floor can range from 400kg per m2~ 600kg per m2 and will be designed by our project team to suit your requirements.

夹层地板可设计用于广泛的应用和用途,包括存储、办公室和生产。夹层楼板的承重范围为每平方米 400 公斤至每平方米 600 公斤,我们的项目团队将根据您的要求进行设计。

 

It is the ideal solution to maximising the space you have available. So instead of moving premises, you use the area above you instead – creating additional floor space from wasted space above your existing working areas.

这是最理想解决方案最大化利用空间。因此,您无需搬离办公室,您可使用您上方的空间,使用现有工作区域上方的浪费空间创造额外的地面空间

 

When it comes to planning a suitable layout for your storage platform mezzanine floor requirements, our project team will maximise space utilisation and ensure your design is both cost effective and practical.

在为您的存储平台夹层楼层要求规划合适的布局时,我们的项目团队将最大限度地利用空间并确保您的设计既经济又实用。

 

 

Frequently Asked Questions – Mezzanine Floor

 

1. What weight loading is a mezzanine floor limited to?

Answer 1 : Most weight loadings can be accommodated, from light office occupation to the heaviest of industrial applications. All our floors are custom designed to ensure suitability to your requirements.

 

2. What is the standard height of a mezzanine floor?

Answer 2 : We usually designed the decking height of 2440mm / 2740mm / 3040mm , mezzanine floor will be designed to suit your requirements and to suit the use of applications.

 

3. How quickly can a mezzanine floor be installed?

Answer 3 : The installation of a mezzanine is a quick, it’s usually required about 1~3 week or less, as all the major fabrication work is carried out away from your premises and the mezzanine floor is delivered as a complete kit that is then assembled at your premises.

 

4. What disruption will there be when installing a mezzanine floor?

Answer 4 : Our installation team will minimised disruption to you and your company by planning the best logistics of installation and timing.

 

5. Do I need to inform the landlord if I want to install a mezzanine floor?

Answer 5 : Most landlords will require you to inform them of any proposed works and will normally require confirmation that Building management’s approval, Gold Wind Engineering can provide specification design layouts plan for you if required.

 

6. Are your installers experience to build Mezzanine floors?

Answer 6 : We have been installing mezzanine floors nationally for over 21 years and have considerable project experience.

 

For more information on this products, Please contact our sales team as following
有关此产品的更多信息,请联系我们的销售团队.

    Related Products

    bottom of page